Traffic Simulation and Analysis Project
- Fill Team Leader Position.
Deliverable 3 due [06 (end of business day) APR 2022]
PART I REPORT due (06 2359 APR 2022)
- Merge Deliverables 1-3 into a .pdf file titled "CIE439_Part_I_Group_13" and submit via UBLearns.
Part II: Network Selection and Data Collection
- Install SUMO. Complete Step 3 of "Task Instructions" and submit a screenshot of SUMO Performance.
- Visit the Greater Buffalo-Niagara Region Transportation Council (GBNRTC) data warehouse and select a section of the Buffalo network for our case study. Explain why the proposed section of the Buffalo network was selected.
- Obtain a satellite image of the intersection and surrounding area (include street names.) Obtain roadway characteristics (principal/minor arterials, connectors, speed limits, number of lanes, functionality of each lane, etc.)
- Obtain traffic count data from GBNRTC for evening/p.m. peak flow.
- Create network in SUMO (see Task Instructions.)
- Progress Report. Team Leader to submit a statement on member contribution/satisfaction.
PART II REPORT recommended due (08 1700 APR 2022)
- Merge Deliverables 4-9 into a .pdf file titled "CIE439_Part_II_Group_13" and submit via UBLearns.
Part III: Data Analysis and Design of Optimal Signal Plan
- Input Traffic Data into SUMO (see Task Instructions.)
- Model the Network in SUMO and generate: static timing signal plan, fundamental diagrams, emissions report and others reports as may seem fit (e.g. average control delays, LOS, etc.)
- Design an Optimal Signal Plan.
- Discuss performance measures of proposed Signal Plan. Make sure to include a discussion on traffic emissions.
- Write a report describing the improvements of the Design Signal Plan versus the Current Signal Plan.
- Progress Report. Team Leader to submit a statement on member contribution/satisfaction.
PART III REPORT recommended due (15 1700 APR 2022)
- Merge Deliverables 10-16 into a .pdf file titled "CIE439_Part_III_Group_13" and submit via UBLeanrs.
Part IV: Explore Impacts of Future Traffic
- Progress Report. Team Leader to submit a statement on member contribution/satisfaction.
PART IV REPORT recommended due (22 1700 APR 2022)
- Merge Deliverables 17-21 into a .pdf file titled "CIE439_Part_IV_Group_13" and submit via UBLeanrs.
PART V REPORT recommended due (06 1700 MAY 2022)
- Submit a .pdf file titled "CIE439_Part_V_Group_13" via UBLeanrs.